<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=utf-8">
</head>
<body text="#000000" bgcolor="#FFFFFF">
Hi Flex-ers - <br>
<br>
Sorry if this is old news, but Chem had been laboring under a
misconception here. FL Helpdesk says the dates can differ and it's
all up to the Program Manager. We did NOT inquire about the titles
differing....<br>
<br>
Best Regards,<br>
Sheila<br>
<div class="moz-forward-container"><br>
<br>
-------- Forwarded Message --------
<table class="moz-email-headers-table" cellspacing="0"
cellpadding="0" border="0">
<tbody>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">Subject:
</th>
<td>Fastlane Proposal Dates</td>
</tr>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">Date: </th>
<td>Thu, 3 Aug 2017 07:20:18 -0400</td>
</tr>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">From: </th>
<td>Donna Mortimer <a class="moz-txt-link-rfc2396E" href="mailto:dmortimer@whoi.edu"><dmortimer@whoi.edu></a></td>
</tr>
</tbody>
</table>
<br>
<br>
<pre>Hi - I just checked with the Fastlane help desk, and the start date on
collaborative proposals do not have to be the same for all the
collaborating institutions, so no need to be concerned with dates on the
cover sheets matching any longer (I guess this was never an issue). D-
</pre>
</div>
</body>
</html>